St. George Replacement Airport Projects
- Geotechnical Investigation Report, which included 64 borings and 15 test pits, laboratory testing, and earthwork recommendations.
- Mass grading and Storm Drain for Grading and Drainage Package
- Construct Finish Grading Project, including grading for the Terminal and ARFF Building Pads, Apron, remaining VSR, FBO, GA, and Runway Safety Areas.
- Construct Airport Landside Culinary Waterline
St. George Municipal Airport Projects
- Rehabilitated Runway 16/34 by rotomilling 3 inches of pavement, laying a new 3 inch surface course, adjusting runway lighting to meet safety standards, and re-grading safety area
- Constructed three new taxilanes on the west side of the airport
- Constructed terminal apron, northwest, northeast, and east mid-field aprons
- Constructed 3,800 foot parallel taxiway “B”
- Rehabilitated the MIRL and MITL on taxiways “A” & “B” and runway
- Rehabilitated Runway 16/34 requiring crack sealing and pavement overlays, including crumb rubber hot plant mix, latex rubber friction courses
Ogden-Hinckley Airport Project
- Reconstructed Runway 03/21, the primary ILS Runway, using in-place pulverization, excavation, incorporating frost protection, and installing runway shoulder drainage.
- Reconstructed Runway 16/34 utilizing in-place pulverization, soil stabilization, re-grading, and a bituminous surface course
- Constructed the runway safety area and ILS critical area grading for a new ILS installation Designed and reconstructed Runway 16/34 utilizing in-place pulverization, soil stabilization, re-grading, and a bituminous surface course
- Overlaid Runway 16/34 with an open-graded porous friction course
- Reconstructed the airport terminal apron using Portland cement concrete to meet higher aircraft weight requirements.
- Constructed two new taxilanes in southeast hangar area
- Rehabilitated five tie-down and holding aprons
- Constructed new parking apron for Kemp facility
Brigham City Municipal Airport Projects
- Constructed 1,400 foot Runway 16 extension
- Rehabilitated Runway 16-34
- Constructed a new full length parallel taxiway and connectors
- Constructed runway and taxiway subsurface and side drainage system
- Constructed runway and taxiway storm drain system with pump stations
- Constructed a new taxilane for the north and south aprons
- Constructed new aircraft apron
- Widened runway 16/34 from 75' to 100' using soil stabilization techniques
- Constructed new category B-II runway safety area using soil stabilization techniques
Monticello Municipal Airport Project
- Currently constructing Runway 16/34, Taxiways, Apron, and Access Road Grading, consisting of approximately 500,000 cubic yards of P-152 Embankment
- Construct 1,500 lineal feet of D-701 Storm Drain Pipe
- Construct 19,500 lineal feet of D-705 Pipe Underdrain along edges of future runway and taxiways
Grand Canyon West Airport Projects
- Constructed new Water and Sanitary Sewer pipelines
- Currently constructing a temporary airport terminal, fuel tanks, electrical generators, and extensive site concrete work, which includes a large bus turnaround
- Grading and Drainage for 5,000 foot Runway 17/53, which includes approximately 166,500 cubic yards of P-152 Excavation and 51,425 square yards of P-209 Crushed Aggregate Base Course
Kayenta Airport
- Reconstruct 7,100 foot Runway 5/23 with associated taxiways and apron
- Relocate Airport Entrance Road
- Construct intersection of relocated Airport Entrance Road and U.S. Highway 160, including acceleration and deceleration lanes meeting ADOT standards
Lincoln County Airport
- Apron Reconstruction and Expansion
- Construct Runway 17 Bypass Taxiways
- Reconstruct Runway 17/35
- Relocate Access Road
Cedar City Regional Airport
- Construct North Hangar Area
- Construct Taxi lanes 1 and 2, including P-152 Embankment, P-208 Crushed Aggregate Base Course, and P-401 Asphalt Pavement
- Install utility corridor to North Hangar Area
Nephi Municipal Airport Project
- Constructed new 6,300 foot runway and associated taxiways
- Expanded and reconstructed tie-down apron
Cal Black Memorial Airport Projects
- Constructed new 5,700 foot runway and associated taxiways
- Constructed new 200 x 700 foot tie-down apron
- Constructed new full length parallel taxiway and two connector taxiways between Runway 01/19 and parallel taxiway
- Constructed Fuel Farm facility with two, 10,000 gallon tanks, pumping systems, and concrete spill retention basins
Kanab Municipal Airport Project
- Reconstructed and lengthened the runway to 6,200 feet
- Constructed runway overlay with porous friction course.
Panguitch Municipal Airport Project
- Relocated, lengthened, and constructed new 5700 foot category B-II runway
- Constructed additional tie-down apron
- Rehabilitation of the runway using rotomilling, and a new bituminous surface course
Other Airport Improvement Projects
- Page Arizona Municipal Airport Projects - A.I.P. 3-04-0025-10, 3-04-0025-15&16
- Parawon Municipal Airport Projects - A.I.P. 3-49-0050-05, 3-49-0050-07
- Colorado City, Arizona Airport Project - A.I.P. 3-04-0076-07
- Escalante Municipal Airport Project - A.I.P. 3-49-0007-02
- Beaver Municipal Airport Project - A.I.P. 3-49-0001-05
- Green River Municipal Airport Project - A.I.P. 3-49-0010-07
- Richfield Municipal Airport Project - A.I.P. 3-49-0028-05